
WAPA Power Line Repairs Replace Temporary Structures Installed After 2022 Storm
Over the next six months, the Western Area Power Administration (WAPA) and contractor Spartan Infrastructure, Inc., will be replacing power lines within the Salt River Pima-Maricopa Indian Community. This will complete the emergency repairs which began after the July 17, 2022, severe windstorm that damaged 3.5 miles of high-voltage electrical transmission line in the Lehi […]